Real Projects, Real Results

Here's the stuff we've actually built. Not just pretty renders - these are buildings you can walk into, touch, and actually use. We're pretty proud of 'em.

Before renovation After renovation
DRAG ME
HERITAGE RESTORATION

Granville Island Warehouse Conversion

Took a 1920s fish processing warehouse that was basically falling apart and turned it into workspace people actually wanna spend time in. Kept the old timber beams, brick walls - all that character stuff - while making it earthquake-safe and energy efficient.

PROJECT SPECS
Location Vancouver, BC
Completed March 2023
Size 12,500 sq ft
LEED Rating Gold
Energy Improvement
68% Reduction
Seismic Upgrade Solar Ready Reclaimed Materials

"They managed to keep everything we loved about the old building while making it work for modern needs. Didn't think it was possible."

- Building Owner
Before construction After construction
DRAG ME
INDUSTRIAL NEW BUILD

Richmond Advanced Manufacturing Hub

Built this one from scratch for a tech manufacturing company that needed serious climate control and clean room capabilities. Ground-up design meant we could bake sustainability into every decision instead of retrofitting later.

PROJECT SPECS
Location Richmond, BC
Completed November 2022
Size 45,000 sq ft
LEED Rating Platinum
Renewable Energy
85% On-site Solar
80%
Water Reduction
92%
Waste Diverted
Geothermal HVAC Living Roof Rainwater Harvesting EV Charging

"Our energy bills are literally a quarter of what we budgeted. The building basically runs itself."

- Facility Manager
Before restoration After restoration
DRAG ME
HERITAGE + ADAPTIVE REUSE

Gastown Printing House Revival

This 1912 printing house was on the city's 'at risk' heritage list when we got involved. Client wanted mixed-use - retail below, offices above. Tricky part was upgrading everything without losing the protected facade and interior details.

PROJECT SPECS
Location Gastown, Vancouver
Completed June 2023
Size 8,200 sq ft
Heritage Status Protected
Original Features Preserved
95% Retained
Fun fact: We found original 1920s newspapers stuffed in the walls as insulation. Now they're framed in the lobby.
Window Restoration Brick Repointing Historic Tax Credits
Before renovation After renovation
DRAG ME
INDUSTRIAL CONVERSION

Yaletown Brewery & Production Facility

Former textile warehouse converted into a working brewery with taproom. Had to deal with some gnarly plumbing requirements, heavy equipment loads, and making sure the production side didn't interfere with the public space vibe.

PROJECT SPECS
Location Yaletown, Vancouver
Completed September 2022
Size 15,800 sq ft
Capacity 20,000 BBL/year
Climate Control
Water Recycling
Heat Recovery
Floor Reinforcement Acoustic Treatment Custom Ventilation

"They understood brewing operations better than some brewery consultants we've worked with. Everything just works."

Got a Project in Mind?

Whether it's a heritage building that needs some love or a brand new industrial facility, let's chat about what you're trying to do. We're pretty good at figuring this stuff out.